PUCs and PSCs are impartial regulatory companies appointed from the state legislature. Turbines can only be built with acceptance through the PUC or PSC, and these companies set appropriate electricity prices within their condition the utilities need to abide by [two]. Traps and system phone calls are two mechanisms used by an running system (OS